All Technology Relations for LT-CFB demonstration plant - phase 1
Show all technology relations
The designing of a 4-8 MW demonstration gasification plant
Funded project: ForskEL
The funded phase 1 aims at providing the decision basis for designing a 4-8 MW demonstration gasification plant based on low-temperature circulating fluidised bed (LT-CFB) with slurry fibres and biogas production residual products as fuels. The produced gas will thus substitute fossil fuels.
Project manager:
DONG Energy
Participants:
DFBT Aps
Risø DTU
Budget:
ERP: DKK 3,200,000
Total budget: DKK 5,249,000
Completion:
1st quarter 2010
Read more about funded projects in the annual report on Danish energy research programmes here:http://www.stateofgreen./Pages/Funded-projects