LT-CFB demonstration plant - phase 1

LT-CFB demonstration plant - phase 1

 
Solution type: in Development phase

The designing of a 4-8 MW demonstration gasification plant

Funded project: ForskEL

The funded phase 1 aims at providing the decision basis for designing a 4-8 MW demonstration gasification plant based on low-temperature circulating fluidised bed (LT-CFB) with slurry fibres and biogas production residual products as fuels. The produced gas will thus substitute fossil fuels.

Project manager:
DONG Energy

Participants:
DFBT Aps
Risø DTU

Budget:
ERP: DKK 3,200,000
Total budget: DKK 5,249,000

Completion:
1st quarter 2010

Read more about funded projects in the annual report on Danish energy research programmes here:http://www.stateofgreen./Pages/Funded-projects