Integrated design of wind power systems

Integrated design of wind power systems

 
Solution type: in Development phase

The combining of dynamic simulations and dedicated tools for electricity design and control in the electricity system

Funded project: EUDP/ERP

By combining dynamic simulations and dedicated tools for electric design and control, aeroelastic design and integration into the electricity system, attempts will be made at fully integrating the considerable dynamic interaction between these areas in a future wind energy system design.

Project manager:
Institute of Energy Technology-AAU

Participants:
KK Electronics A/S
Wind Energy Department at Risø-DTU
Siemens Wind Power

Budget:
ERP: DKK 1,499,200
Total budget: DKK 2,345,200

Completion:
4th quarter 2009